Overview
MEC was commissioned by Richborough to provide multi-disciplinary support for up to 700,000 square feet of industrial and logistics space at Junction 9 of the M42 in North Warwickshire. Plans bring forward a modern employment scheme comprising B2/B8 space with ancillary E(g) uses, supported by new access, parking, service yards, HGV facilities, landscaped areas and dedicated habitat creation.
Overview of MEC Services
Geomatics:
The Geomatics teams undertook a comprehensive 3D topographical survey across the site, covering the existing highway network and adjoining land. The survey captured detailed surface levels, road geometry, carriageway features, highway assets, ground features and surrounding infrastructure, producing a detailed representation of the existing site conditions. The survey information was delivered in both PDF and DWG formats.
To underpin the survey, a robust and reliable control network was established, providing a consistent spatial framework and ensuring accuracy across the survey data.
The team also carried out a drainage survey to map the existing infrastructure and connections. These datasets were then used to inform the development design, strategy and cross-discipline assessments, providing a reliable foundation for design development and wider project coordination.
Geo-Environmental:
Our Geo-Environmental team undertook a Phase I Desk Study and soil infiltration rate testing, assessing the site’s ground conditions, history and environmental constraints. Detailed liaison was held with Cadent to ensure the soil infiltration rate testing protected the gas main crossing the site, including agreeing traversal routes and frequency of plant crossing the asset.
A separate Geotechnical Risk Assessment was prepared to satisfy the requirements of National Highways. The assessment confirmed that proposed earthworks, foundation zones and level changes would not affect the adjacent M42, providing a clear route into more detailed ground investigations post-planning.
Acoustic:
Our Acoustic team carried out an Acoustic Assessment prepared for the proposed employment development at land at Lichfield Road, Junction 9 of the M42, considering the potential effects of construction, operational and traffic-related noise on nearby sensitive receptors. The assessment was undertaken in accordance with criteria set out within BS5228-1:2009+A1:2014, BS 5228-2:2009+A1:2014 and BS4142:2014+A1:2019. Baseline monitoring demonstrated that the site is located within an existing high-noise environment influenced by the M42, M6 Toll and A446.
Construction noise effects were identified at the nearest residential properties; these impacts were considered capable of being effectively managed through standard good-practice measures, including a Construction Environmental Management Plan and the adoption of suitable construction methods.
Development-generated traffic was also predicted to have a negligible effect on local road traffic noise levels
As no information was available on the type of fixed plant that would be installed at the site, noise level limits were recommended based on the measured background sound levels for the nearest sensitive receptors (NSRs).
The assessment indicated that, as a worst-case impact in accordance with BS 4142, operational activity would range between ‘Low’ and ‘Adverse’ impacts during the daytime, and between ‘Low’ and ‘Significant Adverse’ impacts during the night-time.
Mitigation measures including installation of appropriate acoustic screening, mechanical services designed to achieve limits, and an operational noise management plan were recommended to reduce impacts at the NSRs.
Air Quality:
The Air Quality team assessed to prepare for the proposed employment development on land at Lichfield Road, Junction 9 of the M42, focusing on traffic-related emissions of NO₂, PM₁₀ and PM₂.₅. Dispersion modelling showed that pollutant concentrations at most surrounding receptors would remain below the relevant air quality objectives, with development traffic causing only minor increases that were generally classified as negligible. There were two receptors that were predicted to experience exceedances of the relevant PM2.5 objective level, with and without proposed development traffic. The assessment was undertaken using existing emission and background data, alongside future year traffic flows.
Mitigation measures in accordance with North Warwickshire Borough Council guidance were recommended in order to reduce the potential effects associated with increased air pollutant concentrations.
A construction dust assessment identified a low risk of dust soiling and health effects, subject to the implementation of standard good-practice mitigation measures. Overall, the assessment concluded that the proposed development would not give rise to significant adverse air quality effects and is acceptable from an air quality perspective.
Lighting:
Our Lighting team reviewed existing lighting conditions around the A446, Marsh Lane and the motorway network before modelling the anticipated external lighting for the proposed development. The assessment considered light spill, sky glow and glare effects on both road users and nearby land. A technical response to National Highways provided additional clarity on predicted glare levels, demonstrating that targeted measures—such as shielding, column adjustments and enhanced landscaping—can secure compliance with CIE 112 and be finalised through detailed design.
Outcome
The site’s proximity to major highways informed MEC’s assessments across several disciplines. By combining accurate survey data, ground risk review and detailed modelling, our teams provided a coordinated package of technical evidence to support the proposals. Planning was granted in November 2026.